I got a letter from my builder last week. It told me to make sure everything was ready for the final payment. To ring my site supervisor about arranging a site visit, and to get Home Building Insurance starting from practical completion.
So I called my Site Sup and he says to call back friday next week, when he'll have a better idea of when it'll be finished up for the key handover. But tentatively it'll be another 4 weeks.
Now I have to get serious about organising quotations for the floor coverings, blinds, side fence, driveway, front fence and redoing the pavement in front of the house (we swapped the garage to other side to maximise north facing living room views).
I wish I wasn't locked out, I don't know what my bathroom looks like! All I know is they've painted the front door (I don't like that colour anymore but we'll repaint it after we've moved in) and the electricity pole is in. There's still the air conditioning, the rest of the concrete stairs, water tank and the rest of the paint job.
Sunday, July 18, 2010
To ensure a smooth transition into your new home
Labels:
final stage
Subscribe to:
Post Comments (Atom)
1 comments:
It sucks being locked out. You'll have to drive past during the day and see if any tradies are in so you can look around.
Good luck with the practical completion. Hope you don't find too many problems.
Keep us posted.
Post a Comment